Kitchen Renovation Timeline: What Happens, Week by Week

A standard kitchen takes 2-4 weeks on site — but the wait before anyone turns up is often longer. Here is the whole sequence, and how long you'll actually be without a kitchen.

· 6 min read

Most people planning a kitchen ask how long the build takes. It is the right question, but it is not the whole one — because the part that catches households out is rarely the build. It is the lead time in front of it, and the stretch in the middle where there is no sink.

Here is the full sequence for a standard Auckland kitchen renovation, from first phone call to final walkthrough.

Before anything is booked: consultation and quote

The process starts with a free in-home consultation. We look at the existing layout, talk through what is and is not working, take measurements, and identify anything that might trigger a consent requirement — moving plumbing or removing a wall usually does, while cabinetry, benchtops and flooring usually do not.

You then receive a fixed-price, itemised quote broken down by task and material. Nothing is ordered and no date is held until you have accepted it, so this stage moves at whatever pace suits you. Some people accept in a week; some sit on a quote for six months while they save. Both are fine.

The lead time nobody plans for

Once the quote is accepted, cabinetry and benchtops are ordered. Both are made to your measurements, which means there is a manufacturing wait before anyone can start on site.

This is the single most underestimated part of a kitchen renovation. Households plan around the two-to-four week build and are surprised that the project spans considerably longer end to end. It is not delay — it is manufacturing — but it is much easier to live with when you have planned for it.

Week 1: strip-out and services

The old kitchen comes out. This is the fastest-looking and least satisfying week: the room is emptied, the old cabinetry and benchtop are removed and disposed of, and the walls and floor are exposed.

It is also when surprises surface. Older Auckland homes sometimes hide dated wiring, a patch of moisture damage, or a floor that is well out of level. Anything found is raised with you immediately rather than absorbed silently — that is the point of an itemised quote.

Plumbing and electrical rough-in happens now, coordinated as part of the project rather than left for you to arrange. If the layout is changing, this is the week that work happens.

Week 2: cabinetry installation

Cabinetry goes in. This is the week the room stops looking like a building site and starts looking like a kitchen, and it is usually the fastest visible progress of the whole job.

Carcasses are levelled and fixed, doors and drawers are hung and adjusted. In older homes where nothing is quite square, the levelling is what separates a kitchen that closes properly in five years from one that does not.

Week 2-3: benchtop template and install

Benchtops are templated once the cabinetry is physically in place, not before — measuring off a plan rather than off the installed carcasses is how gaps happen. That template then goes back for fabrication, which introduces a short second wait mid-project.

This is normally the point at which the sink and hob can finally be connected, so it is the milestone most households are counting down to.

Week 3-4: splashback, flooring tie-in and finishing

Splashback goes in after the benchtop, since it sits on it. Flooring is tied in where the new kitchen meets the existing floor — one of the details most often missing from a cheap competing quote. If you are replacing the floor entirely, that work slots in here and our flooring guide covers how to choose the material.

Then the finishing: appliances connected, hardware adjusted, silicone lines run, and a full tidy-up. Final walkthrough follows, we fix anything that is not right, and the job is handed over with a workmanship guarantee.

How long will you be without a kitchen?

Realistically, from strip-out to a connected sink is most of the project. Plan for a temporary setup: a microwave, a kettle and a jug-washing station somewhere else in the house. Households that set this up in advance find the process dramatically easier than those improvising in week one.

A standard kitchen renovation typically takes 2-4 weeks once materials arrive, depending on scope. Larger jobs, layout changes and anything requiring consent run longer, and a realistic timeframe for your specific kitchen is confirmed as part of your fixed-price quote.

What keeps a kitchen on schedule

  • Decide finishes before ordering, not during the build — a changed benchtop material mid-project restarts a lead time
  • Accept the quote early if you have a fixed deadline, because the manufacturing wait is the long pole
  • Keep one point of contact, so trades are sequenced rather than double-booked
  • Set up a temporary kitchen before strip-out week rather than during it

Every ReInnovations job runs with a single point of contact coordinating every trade, so you are not chasing a plumber and an electrician yourself. See how our process works, or book a free consultation to get a timeline for your kitchen.

FAQ

Questions people also ask

How long does a kitchen renovation take?

A standard kitchen renovation typically takes 2-4 weeks once materials arrive, depending on scope.

How long will I be without a kitchen?

For most of the on-site period, from strip-out until the benchtop and sink are installed. We recommend setting up a temporary kitchen elsewhere in the house before the strip-out begins.

Do I need consent for a kitchen renovation?

Most cosmetic kitchen upgrades (cabinetry, benchtops, flooring) don't need consent. Moving plumbing or removing walls usually does — we'll confirm what applies to your project at the free consultation.